“To
date, we have treated a total of 15 miles of sewer. The
results speak for themselves. Overall, we have reduced
mainline stoppages in areas that were treated. A large portion
of our lateral stoppages has decreased because the foam killed
the roots at the mainline connection with the lateral.”
–M. Kenneth Sutton,
Public Works Magazine |